Heat illness prevention plan · outdoor 3395 · indoor 3396

Heat illness prevention plan review, outdoor and indoor (8 CCR 3395 and 3396)

Heat season, a new site, or an owner asking for your heat illness plan. Find out whether your written plan states what the outdoor rule and, for indoor work, the indoor rule ask it to hold, before someone else reads it.

Service area: Los Angeles County and Southern California. Put your site’s address in your email.

What you are trying to do

You have a heat illness prevention plan, or a paragraph in your IIPP that says you do. Outdoor crews fall under 8 CCR 3395. Indoor work areas at or above 82 degrees Fahrenheit fall under 8 CCR 3396, a separate rule with its own written plan, measurement and cool-down area. You want a person who knows both to read what you wrote and say what is there and what is not.

What the rules ask a written plan to hold

Outdoor: 8 CCR 3395
  • The plan is in writing, in English and the majority language of the workforce, and kept at the worksite for workers and the Division.
  • Water: one quart per employee per hour, free, as close as practicable to the work.
  • Shade present at all times above 80 degrees Fahrenheit, big enough for everyone on a break, and shade or timely access to shade at 80 degrees or below.
  • High-heat procedures from 95 degrees: contact with a supervisor, observation of workers, reminders to drink water and a pre-shift meeting.
  • Emergency response: responding to signs of heat illness, contacting emergency medical services and giving responders directions to the site.
  • Acclimatization: newly assigned workers observed for their first 14 days, and all employees closely observed during a heat wave.
  • Training for every worker before heat work, and for supervisors.
Indoor: 8 CCR 3396
  • Applies to indoor work areas at or above 82 degrees Fahrenheit when employees are present. The measurement and control duties apply where a condition holds: 87 degrees or a heat index of 87, clothing that restricts heat removal at 82, or a high radiant heat area at 82. A person confirms which applies.
  • The plan is in writing and covers water, cool-down area access, temperature and heat index measurement, other heat risk factors, control measures, emergency response and acclimatization.
  • A cool-down area kept under 82 degrees Fahrenheit while workers are present.
  • Heat records kept twelve months or until the next reading.
  • Engineering controls first, then administrative controls and protective equipment where they fall short.

Rule text read at dir.ca.gov on 2 November 2026; check the current text before you rely on it.

How we read it

We read your plan for each item above. For each one the record says: in your plan, with your sentence quoted; missing, which can mean you wrote it in other words; or for your team to confirm, such as whether the shade is really there when it is needed. A CHST reads and writes the record. It shows what is written. It does not say the plan is adequate or that it works on your sites.

  • A written record, with your own sentence quoted for each element we found.
  • Each missing element stated plainly, so you can add it in your own words.
  • The items only your team can confirm, each with a suggested owner on your team.
  • In heat season, a half-day visit also records the shade, water and rest we see. Your plan, and carrying it out, stay yours.

What it costs

Safety Readiness Session

$2,500

Your heat illness plan is read inside the session: one named contract or site, with the rest of the paper you show us. A request smaller than a session is scoped in writing before any work starts. A second read of a plan you revised is billed by the hour and agreed in writing first.

Ask about a session · See a sample record

What we never do

  • Write your heat illness plan. Drafting is a separate written scope that waits on our attorney and is not offered today.
  • Be your competent person, or run your water, shade or rest. Your team does that.
  • Submit anything for you. Acceptance is the owner’s decision.
  • Give a verdict. A read shows what is written. It is not legal advice.
  • Sample, test or assess exposure to dust, silica, fumes or chemicals, or assess, abate or advise on asbestos, lead, mold or fireproofing materials. Those go to a licensed specialist.

Free first step: run the program check

Run your plan through the free program check, which reads it against the text of 8 CCR 3395 and, for indoor work, 3396, requirement by requirement, and quotes the sentence it relies on. Paste your text on the page and read the answer there; no AI and no account. It gives the same answer every time and stores nothing. It shows what is written, never whether it is adequate, and a requirement you wrote in other words can read as not found, so a missing line is a reason to look, not a verdict.

Questions buyers ask

What does it cost?
The Readiness Session is $2,500. Half-day visits are $650. Anything after the session is scoped in writing.

Who have you worked for?
The firm is new. I spent three years in construction site security on the Purple Line, my CHST is on BCSP’s site, and a sample report is on ecowealthsafety.com.

Are you insured?
General liability with NEXT, $1 million per occurrence and $2 million aggregate, and professional liability with NEXT, $1 million per claim and $2 million aggregate, including bodily injury or property damage arising from our work. A certificate of insurance on request. Additional-insured status and primary and non-contributory wording are included when a contract calls for them. Higher limits or a waiver of subrogation are confirmed with the carrier before we sign.

Are you licensed? Workers’ comp? EMR?
We don’t build, supervise or correct work, so we don’t hold a contractor’s license. We have no employees, so no workers’ compensation policy and no EMR of our own.

Set prices: $2,500 for a Safety Readiness Session, $650 for a Half-Day Site Visit, $162.50 an hour with a four-hour minimum. A request commits nobody. Capability statement.